SNAP Environmental Test Facility EE/CA Document Record
The SNAP Environmental Test Facility Engineering Evaluation/Cost Analysis documents are available for review in the links below.
- U.S. Department of Energy, 2007. “Public Notice Seeking Comments on the Engineering Evaluation/Cost Analysis (EE/CA) for the Decommissioning and Decontamination of Building 4024.”
- “Building 4024 Decommissioning and Decontamination Engineering Evaluation/Cost Analysis.” May 1, 2007 Final
- "Factsheet - Removal of Building 4024"
- "Powerpoint briefing on the Building 4024 EE/CA given at the public meeting in Simi Valley, CA", February 21, 2007
- Notice of Public Availability - Action Memorandum for Building 4024
- Building 4024 EE/CA Action Memorandum
- Response to Public Comments
- The Boeing Company, 2005. “SSFL Area IV Historical Site Assessment.” May 2005
- “Comprehensive Environmental Response, Compensation and Liability Act of 1980.” Public Law 96-510. 42 U.S.C. 9601 et seq.
- Executive Order 12580, “Superfund Implemention,” 23 January 1987
- U.S. Department of Energy, 1993. “Radiation Protection of the Public and the Environment.” DOE Order 5400.5, 7 January 1993
- U.S. Department of Energy, 1995. “Phased Response/Early Action Guidance, Module 4: Non-Time Critical Removal Actions.” DOE EH-0506, November 1995
- U.S. Department of Energy, 1993. “Executive Order 12580: Superfund Implementation.” DOE Guidance Document EH-231-015-0593, May 1993
- U.S. Department of Energy and U.S. Environmental Protection Agency, 1995. “Policy on Decommissioning Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA),” 22 May 1995
- U.S. Environmental Protection Agency Region IX, 2007. “EPA Comments on Draft Building 4024 Decommissioning and Decontamination Engineering Evaluation/Cost Analysis.” January 2007
- U.S. Environmental Protection Agency Region IX, 2003. “EPA Concludes Superfund
Evaluation of ETEC Area IV.” December 2003
- U.S. Environmental Protection Agency, 2001. “EPA Requirements for Quality Assurance Project Plans for Environmental Data Operations.” EPA QA/R-5
- U.S. Environmental Protection Agency, 1993. “Guidance on Conducting Non-Time-Critical Removal Actions Under CERCLA.” EPA 540-F-94-009, December 1993
- U.S. Environmental Protection Agency, 1994. “Superfund Removal Procedures: Removal Response Reporting, POLREPs and OSC Reports.” EPA 540/R-94/023.
- Building 4024 Concrete Sampling Report
- U.S. Nuclear Regulatory Commission, U.S. EPA, U.S. DOD, U.S. DOE, 2000. “Multi-Agency Radiation Survey and Site Investigation.” August 2000